Decision Timeline
Project Starts
-
Floor plan and layout
Upon start of framing
-
Roof Color/shingles
-
Window Color/style
-
Exterior Stone
-
Final Siding
-
Front Door Style
-
Backdoor Style
-
Which bathroom are showers vs. tubs
Before Framing is Finished (or right when it’s finished)
-
Plumbing Fixtures Picked
-
Body sprays, rain shower, etc. and what company for the rough ins
-
Bathroom decisions must be made
-
-
Low-Voltage
-
Speakers, tvs, cameras, etc
-
-
Lighting
-
Know where chandeliers vs. cans are going
-
Know bathroom lights, chandeliers, one bar lights, sconces​
-
When Framing is Finish
-
Know where all light switches are going.
-
Meet with HVAC Installer for options
-
What type of insulation you want to do
-
Hardwood flooring type and carpet location
-
Kitchen cabinet design and look as well as appliances (granite too if you want to)
-
Low voltage under cabinet lighting
-
-
Bathroom vanities
-
Meet with Lighting supplier to discuss options
- Finalize Sport court​
- Meet with pool installer
​
After insulation/start of drywall
-
Tile selection and pattern designs
-
Trim selection, base boards, casing, crown – including mantles.
-
Interior Door Selection – Hinge selection
-
Door Handle Selection
-
-
Stair railing, newel posts, and spindles
After Drywall is complete:
-
Paint colors
-
Floor Stain Color
-
Granite selections
-
Landscaping
-
We need to figure out exactly what the plan is for this ** dependent on start date
-
-
Pick out patio pavers/ stone ** dependent on start date​
After Paint is Complete
-
Cabinet Hardware
-
Carpet
-
Bathroom hardware (towel bars etc)
-
House Numbers
-
Mailbox
​
​